Week 30
February 8, 2005
The front door arrived! You can see the beveled glass.
The plywood will stay outside until stucco and paint is finished.

These are the 2x2" shower floor tiles,
and these are the 8x12" wall tiles for the Master Bath.
The downstairs floor was cleaned up of the last odd nails, and was sanded. And the hardwood arrived.

The contrasting color tiles arrived for the bathrooms, as did the sinks.
----- 
Greta decided to try out the master tub! 
to Week 31