Week 20
November 29, 2004

The electrical work continued. Once all of the boxes and cans were in place the wires were pulled.

-----

The gas fireplace was installed... Ted wants to get it (and the furnace) turned on as soon as possible!
The tubs are now all in place. This is the original tub, in its new location.

-----

Dean finished the roof on Saturday.

And they started to put up the "chicken-wire" on the walls in preparation for the stucco.

-----


to Week 21