Week 2
July 26, 2004
Ted and his crew continued the demolition.
The attic had loose cellulose insulation, which had to be taken out and bagged for disposition.
----- 


As the guys finished getting the insulation dealt with, Ted took the garage wall down
----- 
And then the front wall...

Remember the tile we had to fix in the bathroom? Here's the other side

After the dumpster was switched (so the wood could be recycled), cleanup ensued.
----- 
----- 
The magnolia tree looks pretty good from this angle...