Week 19
November 22, 2004
Tony Moreali arrived, with his crew, to start putting in the electrical system. This is the secondary panel upstairs.
----- 
Ted finished the base of the master shower. The floor is sloped to the drain.
----- 
And the bow windows finally arrived.
----- 
----- 
I started stripping paint off the old doors.

The shingles actually arrived last Thursday... but they started to place them on Friday.
----- 
----- 
to Week 20