Week 19
November 22, 2004

Tony Moreali arrived, with his crew, to start putting in the electrical system. This is the secondary panel upstairs.

-----

Ted finished the base of the master shower. The floor is sloped to the drain.

-----

And the bow windows finally arrived.

-----

-----

I started stripping paint off the old doors.

The shingles actually arrived last Thursday... but they started to place them on Friday.

-----

-----


to Stripping Paint

to Week 20