Week 10
September 20, 2004

Placement of the floor joists continued, as well as some of the sheer wall segments.

-----

-----

Remember those big bolts in the foundation?

-----

That's a 10" by 12" header, which spans the stairwell opening.

WE HAVE STAIRS!

-----

-----